A green meter is a type of electricity meter that track both the electricity you use and the extra energy your solar system sends back to the company power grid. It reduces your electricity bills by selling surplus energy to the government. As other meters measure only the total electricity consumption, a green meter helps monitor how much of your electricity comes from clean energy.

The government is promoting solar green meters to support households and businesses to shift toward sustainable energy. The Pakistan government provides discounts or special tariffs for consumers using green meters.

Wapda Green Meter Price

The price of a green meter in Pakistan depends on many factors, such as the meter type phase , government company charges and installation fees. The estimated price range is given below.

Green Meter Installation DetailCost (PKR)
Sanction Load Approval (Kilowatt) Single to Three Phase32,000
Document File from (Alternative Energy Development Board) Certificate34,000
Green Meter60,000
3 – Phase Cable12,000
Other Cost30,000
Total Estimated Cost168,000 Approximately

How to Apply for a Green Meter in Pakistan- Complete Guide

If you have installed a solar system in kilowatt and you can apply for a green meter. The following these simple steps is complete guide:

1. Check Your Eligibility for Green Meter:

  • At least 3kW solar system should be installed.
  • Proper and standard installation solar system.
  • Follow the electricity supply company regulations.
  • Connection type should be 3-Phase.

2. Contact Your Electricity Provider:

Reach out to your local power distribution company e.g. (LESCO). Each elctricity supply company has its own green meter application procedure and charges. The following electricity provider are:

  • LESCO (Lahore)
  • FESCO (Faisalabad)
  • IESCO (Islamabad)
  • MEPCO (Multan
  • K.E (K-Electric Karachi)
  • PESCO (Peshawar) , HESCO (Hyderabad), QESCO (Quetta), and other .

3. Submit Required Documents:

Prepare and submit the following documents:

  • Copy of CNIC (National ID card)
  • Copy of Current Electricity Bill (latest paid bill)
  • Solar System Installation Certificate from the installer
  • Net Metering Agreement Form (provided by DISCO)

4. Pay Fees & Get Approval:

After submitting the application, you will be required to pay processing and meter charges to concerned Bank. Once your application is approved, the electricity company will schedule an inspection of your solar system place.

5. Meter Installation & Net Metering Activation:

When the inspection is complete and everything is verified by team, the company will install your green meter and activate net metering. This process may take 4-6 weeks depending on the electricity company.

Green Meter Electricity Bill

Anyone who installed minimum 3kW solar system and above can apply for a green meter under the net metering system.

Your green meter will display:

  • Import Units.
  • Export Units.
  • Total Consumption

No, the price may vary depending on the electricity supply company provider and the region.

The net metering is only available for systems of 3kW and above. Smaller systems may not qualify for Green Meter scheme.

Conclusion

A green meter is an important investment if you are using solar energy in Pakistan. It helps you reduce electricity bills, through surplus energy and contribute to a cleaner environment. The process to apply for a green meter is very easy, but it requires proper documentation and approval from your electricity provider company.

If you are planning to get a green meter, complete the application process requirements for apply.